Construction of 4 lane Access Controlled New Greenfield Highway Section (Mancherial-Warangal)from Narva village at Design Ch.3.834 Km to Puttapaka village at Design Ch.35.300 Km(Total length 31.466 Km) and Construction of Major bridges, ROB, Minor Bridges, VUP, LVUP, Culverts, drains, etc.